| Overview | |
|
Entry Into Service 2015 One Private Owner Since New Always Hangared Two Auxiliary Fuel Tanks (ACTs) Rockwell Collins Venue Cabin Management System (CMS) FANS-C / CPDLC / ADS-B Out / TCAS 7.1 KA Band High Speed Internet 12 / 24 / 36 Month Inspections and Landing Gear Overhaul |
|
| Price: | Contact Seller |
| Offered By: | The Jet Business |
| S/N: | 6069 |
| Location: |
United Kingdom
|
| Days Active: | 530 days ago |
| Airframe | |
| Total Time: | 2,382 Hours |
| Landing Cycles: | 838 |
| Avionics | |
| Additional Equipment | |
|
NAVIGATIONAL COMPLIANCE FANS-C CPDLC ADS-B Out v.2 TCAS 7.1 |
|
| Engines | |
|
ENGINES Manufacturer: CFM International Model: CFM56-5B4/3 ENGINE 1 (LEFT) ENGINE 2 (RIGHT) Serial Number: 569217 569218 Total Cycles Since New: 838 838 |
|
| Engine 1 Hours: | 2,382 SNEW |
| Engine 2 Hours: | 2,382 SNEW |
| Interior & Exterior | |
|
Number of Passengers: 27 (Certified For Taxi, Take-Off & Landing) Forward Lounge: Three (3) Place Divan With Electric Hi/Lo Table (Foldout Queen Size Bed) One (1) Executive Seat Two (2) Place Club Seating 42” Bulkhead Monitor Master Suite: Master Bedroom with Queen Size Bed Master Lavatory with Shower Separate Low & Full Height Storage Dining Area: Three (3) Place Divan with Electric Hi/Lo Table (Foldout Queen Size Bed) Three (3) Executive Seats 42” Bulkhead Monitor Business Lounge: Four (4) Place Conference Grouping opposite Three (3) Place Divan 42” Bulkhead Monitor Staff Area: Eight (8) Business Class Seats with Overhead Luggage Storage Galley Locations: Forward & Aft Lavatory Locations: Forward Crew & VIP, Aft (separate Men’s and Women’s) ENTERTAINMENT Rockwell Collins Venue Cabin Management System (CMS) / In-Flight Entertainment (IFE) GALLEY & CABIN FEATURES Steam Ovens Microwave Ovens Refrigerator Coffee Maker Air Chiller Instant Water Heater CMS Touch Screen Controls Cabin Telephone System External Camera System 230VAC / 50Hz Power Outlets 115VAC / 60 & 400Hz Power Outlets N2 Aero Thermal / Acoustic Insulation |
|
| Overall Matterhorn White With Blue and White Stripes | |
| Other Info | |
|
Inspection Status: Upcoming: 12 / 24 / 36 Month Inspections Landing Gear Overhaul KA Band High Speed Internet Installation Maintenance Facility: AMAC Aerospace AG, Switzerland (currently scheduled for July 2024) |
|
| Brochure: | View Brochure |