Overview | |
Engines Enrolled on RRCC Enhanced APU Enrolled on JSSI Airframe Enrolled on Smart Parts Plus Crew Force Measurement System (Part 135 Capable) 13 Passenger Configuration Avance L5 Internet Venue Cabin Management System DU 875 Cockpit Upgrade w/ Charts Located in Washington D.C. (IAD) |
|
Price: | Contact Seller |
Offered By: | Jetcraft Corporation |
S/N: | 9166 |
Location: |
Washington United States ![]() |
Days Active: | 188 days ago |
Airframe | |
Total Time: | 5,908 Hours |
Landing Cycles: | 2,050 |
Avionics | |
The Bombardier Global 5000 is equipped with an integrated, Honeywell Primus 2000XP avionics suite. | |
Additional Equipment | |
OTHER NOTABLE FEATURES SB 700-1A11-31-021 rev 01 – Batch 3.4 Software Upgrade SB 700-1A11-34-027 – FANS 1/A+ and RNP 4 30/30 SB 700-1A11-34-028 – LPV SB 700-1A11-34-036 – ADS-B Out SB 700-1A11-34-038 – TCAS 7.1 SB 700-1A11-22-001 – AFCS Autopilot Emergency Descent Mode ENTERTAINMENT Display / TV Monitor(s) - Three 24” Fwd and Aft Bulkhead Monitors Tailwind Satellite TV (Subscription Not Activated) |
|
Engines | |
Left Engine Right Engine Description Rolls-Royce BR 700-710A2-20 Serial Number(s) 12869 12870 Total Cycles Since New 2,023 Cycles 2,050 Cycles Program Coverage Rolls-Royce Corporate Care Enhanced |
|
Engine 1 Hours: | 5,791.4 SNEW |
Engine 2 Hours: | 5,908.8 SNEW |
Interior & Exterior | |
Number of Passengers - Thirteen (13) Galley Location - Forward Forward Cabin Configuration - Four (4) Place Club Mid Cabin Configuration - Four (4) Place Conference group opposite a Credenza Aft Cabin Configuration - Two (2) Place Club opposite Three (3) Place Divan Lavatory Location(s) - Forward and Aft Galley Equipment - Hi-Temp Oven; Microwave Oven Refurbishment - Refurbished in 2016 including new Wood Veneer and LED Lighting |
|
Year Interior: | 2016 |
Base Paint Color(s) - White PPG (BAC706) Stripe Color(s) - Blue PPG (BAC6161) & Grey PPG (BAC707) New Paint - Completed at West Star (East Alton) December 2022 |
|
Year Painted: | 2022 |
Other Info | |
Inspection Status: Inspection Last Performed Next Due 15 Month August 2024 Feb 2026 30 Month August 2023 May 2026 60 Month March 2021 April 2026 120 Month May 2016 April 2026 240 Month N/A April 2026 |
|
Brochure: | View Brochure |