1991 Dassault Falcon 50

Overview
1C/5C accomplished in July 2022, 2C not due until July 2028
Landing Gear Overhaul not due until MAR 2028
Dual UNS1Fw GPS/FMS WAAS/LPV
Good Cosmetics
MSP Gold
Price: Contact Seller
Offered By: Southern Cross Aviation LLC
Registration: N312WM
S/N: 224
Location: Ft Lauderdale, Florida
United States
Days Active: 421 days ago
Airframe
Total Time: 8,861 Hours
Landing Cycles: 5,680
Avionics
Dual UNS-1Fw GPS/FMS (1000.8)
Collins Dual VHF-22C w/ 8.33 Spacing
Collins WXT-250A Weather Radar
Collins Dual VIR-32 Navs w/ FM Immunity
Collins TTR-920 TCAS II (MOPS 7.0)
Collins Dual ADF-60A
Honeywell Mark V EGPWS
Collins Dual DME-42
Collins EFD-86 Five Screen EFIS
Collins Dual RTUs
Collins Dual ALT-55B Radio Altimeter
Fairchild A100A CVR
Honeywell Triple Laseref II IRS
Bendix King Dual KTR-953 HF Radios
Collins FCC-86D Flight Control System
Artex ELT C406-1 406MHz
Collins Dual TDR-94D Enhanced Mode S Transponders w/ ADS-B Out
Additional Equipment
Honeywell AFIS DMU
Dual Davtron M811B Clocks
Teledyne Angle of Attack Indication System
Collins Airshow 400
RVSM SB F50-246 Compliant
Concorde RG390E/LS Lead Acid Main Batteries
CAMP Maintenance Tracking Enrolled
Aircell ST3100 Radio/Satellite Telephone
Honeywell N1 DEECs
Wing Fuel Tank Dry Bay Mod AD & SB C/W 3/7/16
Engines
ENGINES
Honeywell MSP-Gold
TFE731-3-1C
CZI = 4200 hrs
MPI = 1400 hrs

Engine #1
CSN: 5,647
Hrs until MPI: 482.2
Hrs until CZI: 2,007.5

Engine #2
CSN: 5,555
Hrs until MPI: 788.0
Hrs until CZI: 3,688.0

Engine #3
CSN: 5,559
Hrs until MPI: 673.8
Engine 1 Hours: 8,529.9 SNEW
Engine 2 Hours: 8,705.6 SNEW
Engine 3 Hours: 8,687.9 SNEW
Interior & Exterior
Refurbished December 8, 2006
9 Passenger Cabin Configuration & Jumpseat
Aft Lavatory and Fwd Galley
Tia WaveJet Microwave & Hot Liquid Container
110V Cabin Outlets
DVD/CD/AUX Cabin Entertainment w/ Fwd Cabin Monitor
Cabin LED Lighting
White with Orange & Gray Stripes, painted 03/07/2016
LED Taxi, Landing, Nav & Rear Strobe
Other Info
Inspection Status:
1Bdue in 1450 hrs | 12M dueJuly 2024
2B & 4B due in 1597 hrs | 24M due May/June 2022
3B due in 3097 hrs | 36M due July 2025
1C/5C accomplished in July 2022, 2C due July 2028
MLG, NLG & Drag Brace Overhaul due MAR 2028
Brochure: View Brochure
Seller Website