Overview | |||
N93LP is a turnkey C90 option with Excellent Cosmetics, Low Airframe Time, and Up-to-Date Maintenance! Only two (2) owners. (Same owner for the last 14 years). Perfect M.O.R.E Program Candidate! Available immediately. | |||
Price: |
$780,000 USD
|
||
Offered By: | USA Aircraft Brokers Inc. | ||
Registration: | N93LP | ||
S/N: | LJ901 | ||
Location: |
St. Louis, Missouri United States ![]() |
||
Days Active: | 70 days ago | ||
Airframe | |||
Total Time: | 7,839 Hours | ||
Landing Cycles: | 6,305 | ||
Avionics | |||
Sandel EFIS SN4500 HSI Right Side Century Flt Dir IV w/ Icarus GPSS Steering Module 2nd Century ADI Installed w/ Select Switch Bendix RDR 130 Weather Radar Avidyne Flightmax EX500 MDF WAAS GPS/NAV/COM/ARS- Avidyne IFD550 COM 2 and 3- King KTR-905 NAV 2- King KNR-630 DME- King KDM-706 ADF- King KDF-805 COM 3 (CLR/DEL Switch Installed) Dual Avidyne AXP322 ADS-B Out Avidyne Skytrax 100B, ADS-B In Avidyne TAS 610 WX-1000 Stormscope GDL 69 XM Weather ACK E-04 (406) |
|||
Engines | |||
Engine(s) Details:Engine Program: M.O.R.E Program Candidate Engine Mfg: Pratt & Whitney Canada Engine Model: PT6A-21 Left Engine #1 S/N: PCE24780 Left Engine #1 CSOH: 4,189 cycles Right Engine #2 S/N: PCE24781 Right Engine #2 CSOH: 4,189 cycles Right Engine Note: 2.0 Hours-Time Since Hot Section Inspection RH Engine- Hot Section Inspection-Complied with December 2023 Overhauled RH/LH Fuel Control Units, Overhauled High Pressure Fuel Pumps, Replaced All Engine Mount Rubber Pads (12 Total) Props: Hartzell MOD HC-D4N-3C (Raisbeck/Hartzell 4-Blade Quiet Turbofan Prop) Left Prop- S/N: FY3739 400 Hours-Time Since Overhaul Right Prop- S/N: FY2407 400 Hours-Time Since Overhaul |
|||
Engine 1 Hours: | 4,324 SMOH | ||
Engine 2 Hours: | 4,324 SMOH | ||
Interior & Exterior | |||
2018, Executive/7 Passengers (4-Place Club Seating w/ Aft Side-Facing Seat and Belted Lav) Gray Leather Seating, New Carpet 2019, Burlwood Cabinetry |
|||
Year Interior: | 2018 | ||
(2005) Overall Matterhorn White w/ Grey and Blue Accent Stripes |
|||
Year Painted: | 2005 | ||
Other Info | |||
Inspection Status: Phases 1 and 2- July 2023 Phases 3 and 4- February 2024 Landing Gear Overhaul- July 2023 |
|||
Aircraft Documents | |||
|